Valve Test Equipment
Valve test equipment verifies safety relief valves (PSV), breather valves and cylinder valves. PSV pop and reseat pressure, breather valve positive and negative pressure settings, and cylinder valve leak tests — all with data recording for compliance.
Integrated Fluid Pressure Solutions
From a single booster pump to a complete turnkey pressure system — we design, build and integrate every component in-house. One supplier, one warranty, one point of accountability.
Booster Power Units
Air-driven gas/liquid booster pumps + air tank + valve block + piping, skid-mounted and ready to run. Output pressure is stepless-adjustable and holds automatically — for shop air boosting, accumulator charging, nitrogen filling and CNG.
Pressure Testing Systems
Burst stands, hydrostatic testers, air-tightness benches, pulse-fatigue rigs and safety-valve calibration — manual / PLC / computer control, with pressure curves, data logging and traceable reports.
Filling & Recovery
Fire extinguisher / FM200 / CO₂ filling machines with weighing and automatic control, plus refrigerant recovery-and-charging and gas recovery units — built for fire-safety, refrigeration and gas industries.
Custom Engineered Solutions
Tell us your medium, pressure, flow, control method and environment — our engineers design the whole rig, from concept drawings to installation and commissioning.
Why Choose SUNCENTER for Your Equipment
The parts that fail are the parts we make ourselves — four numbers behind every order.
100%In-House
Core Components Self-Made
Gas distribution valves, pump heads, seal selection and control software — all designed and made in our own workshop, not assembled from outsourced parts.
100%Tested
Factory Pressure Tested
Every unit passes hydrostatic, leak and running-stability tests before leaving the factory, with a test report in the box.
13Month Warranty
13-Month Warranty
13 months' free warranty with lifetime technical support and an English-speaking service team.
7-10Days
Hot Models Ship Fast
Hot models ship in 7-10 working days; vertically integrated production keeps custom lead times short too.
Further Reading
Blog system under construction — titles below are planned.
PSV Pop & Reseat: How to Test Correctly
TBC
Breather Valve Setting: Positive & Negative
TBC
Cylinder Valve Leak Test Common Issues
TBC
Tell us your medium, inlet & target pressure and flow — engineers reply within 24 hours.